Details: earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm. on plan including getting out and disposal of excavated earth upto 50m and lift upto 1.5m, as directed by engineer-in-charge. all kind od soil (dsr-2023/2.1.1) providing and laying at or near ground level factory made kerb stone of m-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand) including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete etc. as per direction of engineer in charge (lenght of finished kerb edging shall be measured for payment). (precast c.c kerb stone shall be approved by engineer in charge.) dsr 2023/16.69 providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. all work upto plinth level 1:4:8 (1
Sector: Urban Authority