Details: clearing jungle including uprooting of rank vegetation,grass,bruss wood, trees & saplings of girth up to 30cm measured at a height of 1m above ground level and removal of up to a distance of 50m outside the periphery of the area cleared. demolishing brickwork manually/ by mechanical means including stacking of servicable material and disposal of unservicable material within the subgrade and disposing to 50 meters. preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earthwith lead upto 50 metres providing and supplying equipments for parks for amusement m-150 brick work in 1:4 cement & fine sand mortar in superstructure one brick thick wall including supply of all materials, labour, t&p etc. [s.i. no.(305(a)+309+310)]. 12mm cement paster finish
Sector: RDPR