Details: earth work in excavation including water and liquied mud and under foul condition as si 251 disposal of malba s/laying of pea gravel s/laying of nylon mess as per market rate transporation of capping machine & casting pipe to site. drilling of bore of 200mm dia gl to 40mm drilling of 200mm dia 40 to 75mm lowering of 160mm dia pvc pipe 6kg/cm2 concrete with 4cm gauge brick ballast fine sand and cement in proportion are 1:6:12 in foundation and under floors, including supply of all materials, labour. t& p etc. required for proper completion the work si no..273 as in item 5 above but in r.c.c t-beam & slab roof and r.c.c column in 1:1 5:3 (s.i. 284) m-150 brick worth in 1:4 one cement and four course sand mortar in foundation and plinth including supply of all materials labour t& p etc. required for proper completion of the work.(s.i. no. 305a) 12 mm thick plaster 1:4 with cement and four course sand including supply all material and labour t& p etc. (s.i. no. 584 (a) m.s. or iron wo
Sector: RDPR