Details: excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in charge including all material, labour, taxes but excluding gst earth work in embankment in ordinary soil in pattries excavation to be in the form of regular pits not exceeding 0.50 m. in depth and earth work in embankment to be in 20 cm. layers including ramming and dressing the surface to required levels and slops and also including 1.50 m lift and 30 m lead. complete including all material, labour, taxes but excluding gst construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface., mixing by mix in place method with rotavator at omc, and compactin
Sector: PWD