Details: earth work in excavation by mechanical means (hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by engineer-in-charge. ordinary rock dsr 2023 i.no 2.6.1 1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). dsr2023 i.no 4.1.8 brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in foundation and plinth in: cement mortar 1:4 (1 cement : 4 coarse sand) dsr 2023 i.no 6.1.1 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) dsr 2023 i.no 13.4.1 1:2:4 (1 cement : 2 coarse sand(zone-iii) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) dsr 2023 i.no 4.1.3 providing and laying in position specified grade of reinforced cement concrete,
Sector: Urban Authority