Details: construction of embankment with approved material obtained from availble land as permitted and approved by engineer-in-charge and as per technical specitaion clause 301.3.4.1, with all lifts and leads, spreading, grading to required and compacting to meet requirement of tables 300.1and 300.2 as per technical specification clause 301.5 including all taxes and labour cess but excluding gst construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method and compacting with smooth wheel roller at omc to achieve the desired density, complete as per technical specification clause 401. including all taxes and labour cess but excluding gst cement treated subbase (gsb)- providing, laying and spreading material on a prepared sub grade, adding cement @ 2% by weight to the spread material manually, mixing in place with rotavator and compaction with the road roller at omc to achieve the des