Details: earth work in excavation in cleaning of drain excluding 0.30 m in depth over area in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, disposal of earth should be levels and neatly dressed.uppwd/sor-2020/ar/yeiad extra rate for qty of work excavated or under water and liquid including pumping out of water as required. uppwd/sor-2020/ar/yeiad providing and laying in position machine batched and machine mixed design mix m-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per is: 9103 to accelerate, setting of concrete, improve workability without impairing strength and durability as per direction of engineer-in-charge. (note: cement content considered in this item is @ 330 kg/ . exc
Sector: Industry Development