Details: development worksdismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the engineer-in-charge within a distance of 60 m (200ft.)pwd sor item no. 692 dismentaling of old b.o.e./ paver tile/ stone flooring etc. and stacking of dismentaled bricks at site required for proper completion of the work as directed by e/i.pwd sor disposal of building / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.dsr 2023 item no. 15.60 arrangement of jcb, hydra crane as per site requirement including higher charges, pol, opprator charges etc.rate as per market survey traffic diversion and traffic management on exitsting pilibhit road, machnair road. arragement of pvc traffic cones and pvc diversion blocks signages and barriars t
Sector: Urban Authority