Details: construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. including supply of all materials, labour, tools & plants etc. required for proper completion of the work as per direction of engineer-in-charge and inlcuding all texes but excluding gst. providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (wmm) specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. including supply of all materials, labour, tools & plants etc. required for proper completion of the work
Sector: PWD