Details: cleaning jungles including uprooting of trunk vegetation grass, bushes, wood trees and sapling of girth upto 30cm measured at a height of 1 meter above ground level and removal of upto a distance of 50 meters out side the periphery of area cleared. sor ch. 4 sl 6(259) earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 mtr. distance as directed by the engineer-in-charge. as per pwd sor ch. 4 sr. no. 3(253) excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment locat
Sector: PWD