Details: excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m as per direction of e/i including cost of all material, labour, royalty, t&p and all other taxes as applicable but excluding cost of gst. construction of embankment with approved materials deposited at site within 1.0 km from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. as per direction of e/i including cost of all material, labour, royalty, t&p and all other taxes as applicable but excluding cost of gst. construction of embankment with approved material obtained from borrow pits with all lifts and leads 1.0 km, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. as pe
Sector: PWD