Details: earth work in cutting/filling and making base for boulder pitching, launching appron etc. in all type of soil . including all lead and lift and t&p etc. required earth work for making base for boulder steeping/pitching in all type of soil including all lead and lift opening of g.i.wire crates laying disturbed in the body of spur of appron /stepping of taking out boulder from crate including all lead and lift. all cost of material, labour and t&p etc. supply and laying 8 swg g.i.wire (heavy coated) double knotted crate of size 2.00 x 1.500 x 1.00 m and mesh size 0.20 x 0.20 m including all cost of material, labour and t&p etc. supply and laying 8 swg g.i.wire (heavy coated) double knotted crate of size 2.50 x 1.500 x 1.00 m and mesh size 0.20 x 0.20 m including all cost of material, labour and t&p etc. supplying and placing stone boulder in g.i. wire crate of size 2.00x1.500x 1.00 m including all cost of material, labour and t&p. but excluding cost of g.i.wire crate for boulder step
Sector: Irrigation