Details: construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. upto 5 km lead. providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kn static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per technical specification clause 405 (by manual means) providing and applying tack coat with bitumen vg-10 using pressure distributor @ 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom. providing and laying dense graded bituminous macadam with higher capacity batch type hmp using crushed aggregates of specified grading, premixed
Sector: PWD