Details: dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismatled materials as directed by the engineer-in- charge with in a distance of 60 meter (200 feet). s.i. no. 697. earth work in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m. and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of surplus earth as derected by the engineer-in-charge upto a distance of 30m from the foundation trenches. (where machine can not reach/move). for building work only (excuding royalty) disposal of surplus earth i.e dismantaled of cc material cancar ballest etc sand filling in plinth i/c supply of necessary quantity of sand from a distance not exceeding 8km from site of work and i/c watering,dressing etc.rate to including supply of all material,labour and t&p etc.required for proper completion of work. supply of the following
Sector: RDPR