Details: clearing jungle including uprooting of rank, vegetations, grass, bush, wood trees and saplings of girth upto 30 cm. measured at a height of 1 metre above ground level and removal of upto distance of 50 m. outside the periphery of area cleared.. analysis of rate on the basis of item 41 of cpwd analsis of 1s55 schedule) loosening, leveling and compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at omc and then compacted by rolling so as to achieve minimum dry density as given in table 300-2 for embankment construction. construction of embankment and earthen shouldersconstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required and compacted to meet requirement of table no. 300-2 construction of sub-grade with approved material obtained from borrow pits with all lifts & leads
Sector: PWD