Details: earth work in cutting or in embankment in ordinary soil, excavation to be in the from of regular pits not exceeding 1/2 metre depth and earth work in embankment to be in 20 cm. layers including ramming & dressing the surface to the required levels and slopes and also 1.5 metre lifts and 30 m. lead. and with extra lead of 3.00 k.m. cartage including loading, unloading etc concrete with 4 cm. gauge brick ballast, fine sand and cement in proportion of 8:4:1 in foundations including supply of all materials, labour and t & p etc. required for proper completion of work. m 150 brick work in 1 :4 cement and c. sand of 2.25 f.m. mortar in foundation and plinth including supply of all materials, labour and t & p etc. required for proper completion of work. cement concrete with 2 cm. gauge approved stone grit, approved coarse sand and cement in proportion of 4:2:1 including supply of all materials, labour and t & p etc. required for proper completion of work. 12mm thick plaster with one p
Sector: RDPR