Details: excavation for roadway in soil using manual means including loading in tranch for carriying of cut earth to embankment site with all lifts and lead upto 1000 metres as per morth specification clause 300-2.as per sr. no. 3.17 & reference to mort&h specification no. 305.(excluding gst) construction of embankment with material obtained from borrowpits:- construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2.as per sr. no. 3.17 & reference to mort&h specification no. 305 (excluding gst) granular sub-base with graded material:- construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause
Sector: PWD