Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by engineer-in-charge. all kinds of soil (as per dsr code n0. 2.6.1) p.c.c.1:3:6 ( 1 cement : 3 coarse sand (zone-iii) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources). (as per dsr code no. 4.1.5) r.c.c. work in foundation up to plinth levelproviding and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work up to plinth level 1:1.5:3 (1 cement: 1.5 coarse sand (zone-iii) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). (as per dsr code no. 5.1.2) r.c.c. work in foundation above plinth levelreinforced cement concrete work in wa
Sector: PWD