Details: dismantling brick work or stone work in lime or cement mortar and including stacking of material as directed by the engineer-in-charge within a distance or 60 meters (200ft) (s.i. no-692) earth work in emabnkment in ordinary soil including lift upto 1.5 m & lead up to 50.0 mtr including supply of earth, labour and t&p also including cartage 5km up to site. excavation in foundation in ordinary soil (loam clay, or sand ) including lift upto 1.5 m & lead up to 30.0 mtr & including filling,watering and ramming ofexcavated earth in to the trenches or in to the space between the building and the sides of foundataion trenches or in to the plinth and removal & disposal of surplus earth as directed by the engineer- in-charge up to a distance of 30.0 mtr from the foundation trenches .as per s.i no 251 cement concrete with 40mm gauge approved stone ballast, coarse sand and cement in proportions of 1:4:8 including supply of all materials, labour, tools & plant etc required for proper completion o
Sector: RDPR