Details: part-a (bituminous work)providing, laying, spreading and compacting stone aggregates of specific sizes (22.4 to 53 mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregates, watering and compacting to the required density grading 3 as per technical clause 405(3) & including cost of all material, labour, t&p, labour cess and all other taxes but excluding g.s.t. providing and applying tack coat with bitumen vg-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with hydraulic broom as per technical specification clause 503 & including cost of all material, labour, t&p, labour cess and all other taxes but excluding g.s.t. (including cost of bitumen) providing, laying and rolling of open-graded premix carpet of 20 mm th
Sector: PWD