Details: earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by engineer-in-charge.dsr 2.6.1 excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift.dsr 2.25(a) providing and laying in cement concrete 1:6:12 (1 cement :6 fine sand : 12 graded brick aggregate 40 mm nominal size) including supply of all materials,labour and t&p et.required for proper completion of the work and curring complete,also including cost of form work in foundation and floors as per si no.273. 1:2:4 (1 cement : 2 coarse sand (zone-iii) derived from natural sources : 4 graded ston
Sector: RDPR