Details: dismentaling brick work or stone work in lime or cement mortar and including stacking materials as directed by engineer in harge with in a distance of 60 meters ( 200 feet). pwd-692 earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. plain/reinforced cement concrete in open foundation complete as per drawing and technical specifications. pcc m-15 brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and technical specification providing weep holes in brick masonry/plain/ reinforced concrete abutment,
Sector: PWD