Details: nali nirman work earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. as per (uppwd sor si. no. 2.8.1) providing and laying cement, concrete 1:6:12 cement sand and 40mm gauge brick ballast including all respects as per p.w.d. s.i. no. 273 first class brick work 1:4 cement and coarse sand of 1.25 fm mortar in foundation and plinth including supply of all materials labour and t&p etc. required for proper completion of work (uppwd sor s.l. no. 6.1.1) 12mm thick plaster in 1:4 in cement and coarse sand including supply of materials, labour, tools planrs etc. required for proper completion of the work (uppwd sor sl. no. 13.4.1) providing and laying cement concrete 1:2:4(1 cement: 2 c. sand: 20 gra
Sector: RDPR