Details: construction of shoulder with approved material obtained from borrow pits with all lift & lead transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 . as per technical specification clause 301.5. (including labour cess). providing ,laying , spreading and compacting stone aggregate of 53-22.4 mm size to wbm specification including spreading in uniform thickness , hand packing ,rolling with smooth wheel roller 8-10 kn in stage to proper grade and camber , applying and brooming ,stone screening , binding materials to fill up theinterstices of coarse aggregate watering and compacting to the required density. (including labour cess). providing and applying tack coat with bitumen (vg -10) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with hydraulic broom as per technical specification clause 503. (including labour cess). providing, laying and rolling of open-graded p
Sector: PWD