Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared.(dsr 2.31) earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by engineer-in-charge.(dsr 2.6.1) providing and laying 1:5:10 (1 cement : 5 coarse sand (zone-iii) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :(dsr 4.1.10)) brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5,cement mortar 1:4 (1 cement : 4 coarse sand) in found
Sector: Transmission