Details: removing of top cover plate by opening of bolt and nuts of t/f and other internal connection of t/f required for repairing safely and reconnect it after appropriately after minor repairing work of medium power distribution transformer(l l/o.4 kv) installed at various site for stopping oil leakage from t/f and other work as per site requirement & site conditions. firm has to make arrangement for draining and refilling of t/f oil, if required for carrying out the work. (distance of 20 km. from concerned store) 250/400 kva t/f 630/1000 kva t/f toping up/filling of reclaimed t/f oil in t/f's t/f oil in following capacity of t/f's up to 2/3rd level of conservator tank for distribution t/f having less oil as per indent placed for repairing by je/sdo. filling up of these t/f by reclaimed t/f oil upto required level and carriage of reclaimed t/f oil, t/f drums from concerned store/site including safe loading and unloading at both ends. complete in all respect as per site requirement (reclaimed
Sector: Distribution