Details: scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 340-2. construction of subgrade & earthen shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300-2. gsbconstruction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface,
Sector: PWD