Details: earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. providing concrete for plain/reinforced concrete(1:3:6) in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 (p.c.c grade -m10) providing concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203.(r.c.c grade -m25) supplying,fitting and placing tmt bar reinforcement in foundation complete as per drawings and technical specifications clauses 1000 & 1202 s/f of sign board
Sector: RDPR