Details: dismentling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, hold fasts etc. complete and stacking within 50 meters lead. demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable materialwithin 50 metres lead as per direction of engineer-in-charge dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the engineer-in-charge within a distance of 60 metre (200 feet). excavation:earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.2.8.1 all kinds of soil sand and earth filling:supplying and filling in plinth with sand under floors
Sector: Sugar