Details: safe loading, carriage and then safe unloading of the following material from store centres under the jurisdiction of eeesd ayodhaya to dump site proper stacking. 33 kv lightening arrestor c.t. o/d 33 kv ctr 200/100/1-1a 33 kv p.t outdoor 33 kv vcb 800a, 750 mva 33 kv double t/f control pannel 11 kv 3 core cable 3x300 mm xlpe 11 kv cable jointing kit indoor 3x300 sq.mm. xlpe 11 kv cable jointing kit outdoor 3x300 sq.mm. xlpe 24 volt battery set 24 volt battery charger acsr dog conductor m.s. channel 125x65 (for structures) m.s. angle 75x75x6 (for structures) opening of all the 33 kv jumpers, neutral connections, cable connections, opening of earth strips and then shifting of 5 mva t/f from plinth to other side (temporary plinth) in yard. shifting 33 kv jumpers, from actual position to the new shifted place along with 11 kv cable and other accessories and ensure shifted 05 mva t/f must be at temporary plinth and energised with full protection system (activate wti,oti,e/f,o/c,buchole
Sector: Distribution