Details: earth work in trench cutting in proper camber according to required depth for laying garnular sub base including rolling with road roller upto required density, dressing, cost of labour, t&p and hire charges of machinery etc. complete work as per morth clause 301 (3.16) compaction of embankment with approved materials deposited at site from road way cutting (trench cutting) and excavation of foundation of other structure graded and compacted to meet requirement of table 300.2. as per morth no.-305 the rate is including labour cess. construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. (lead 2 km.) construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at omc, and compacting with vibratory roller to ac
Sector: PWD