Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineerin - charge. nominal concrete 1:4:8 or leaner mix (including equivalent design mix) (dsr 2023/15.2.2) earth work in surface excavation not exceeding 30 cm in depth butexceeding 1.5 m in width as well as 10 sqm on plan including getting outand disposal of excavated earth upto 50 m and lift upto 1.5 m, as directedby engineer-in- charge: all kinds of soil. (dsr 2023/2.1.1) carriage of materials by mechanical transport including loading, unloading and stacking. lime, moorum, building . 5.0 k.m 1:4:8 (1 cement: 4 coarse sand (zone-iii) derived fromnatural sources: 8 graded stone adgregate 40 mm nominalsize derived from natural sources). (dsr 2023/4.1.8) brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in foundation and plinth in: cement mortar 1:4 (1 cement: 4 coarse sand) (dsr 2023/6.1.1) providing and laying in p
Sector: Urban Authority