Details: dismantling of bituminous road manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge as per d.s.r. no. 15.43.2(428.50 x 0.735 x 109/107) = 320.83 earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceefing 0.5m in depth and earthwork in embankment to be in 20cm layers, including ramming and dressing the surface to required levels & & also including 1.50m lift & 30m lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. distance as directed by the engineer-in-charge. (excluding royalty) s.i. no. 253 excavation in foundation in ordinary soil (loam, clay or sand) including, lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into th
Sector: RDPR