Details: excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the engineer incharge up to a distance of 30 meters from the foundation trenches. providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand :8 graded stone aggregate 40 mm nominal size) and curing complete,including cost of form- work, in foundation and floors. first class brick work in 1:4 cement and coarse sand of 2.25 fineness modulus) mortar in foundation & plinth including supply of all materials, labour and t & p etc reqiored for proper completion of the work. reinforced cement concrete work in beams, suspended floors, roofs having up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, stair
Sector: Infrastructure