Details: excavation in foundation in ordinary soil as per si no. 251 c.c. work in 1:6:12 cement f/sand and 40mm gauge brick ballast i/c supply of all materials labour t&p etc required for proper completionof work si no. 273 m-150 brick work in 1:4 cement and f/sand as per si no. 305 e/w in cutting or embankment in ordinary soil as per si no. 253 c.c. work in 1:6:12 cement f/sand and 40mm gauge brick ballast i/c supply of all materials labour t&p etc required for proper completionof work si no. 273 p/l of 125 micron polythene over base concrete i/c complete laying of c.c. road slab 1:1.5:3 cement c/sand and 20mm gauge stone ballast over prepared sub grade after its rectification bringing its to proper camber i/c supply of all materials labour t&p as per si no. 773b making of filling construction joints 12mm thick plaster in 1:4 cement and f/sand mortar as per si no. 584 s/f signboard or lokarpan stone
Sector: RDPR