Details: making approach road (ids5.1b) earthwork excavation in ordinary soil including lead 45.0 m and lift 1.5m 40% of e/w (ids5.1b+5.6a) as above but lift 1.5m to bed level 60% of e/w removal of slush in nalabed before excavation of saturated soil.(ids 5.1b+5.6cx10+5.6ax1+5.6g (a) earth work in excavation in foundation in ordinary saturated soil. with 4. 5 lifts & 45.0 m lead (ids 5.1b+5.6cx10+5.6ax1+5.6g(b) c.c.in 1:3:6 cement, sand and 25 to 50 mm stone ballast including the cost of materials labours and etc. required for proper completion of work.( from ananlysis) r.r stone massonery work in 1:4 cement sand mortar including the cost of material, labour etc. required for proper completion of work.( from ananlysis) r.c.r stone massonery work in 1:4 cement sand mortar including the cost of material, labour etc. required for proper completion of work. ( from ananlysis) c.c.in 1:2:4 cement, sand and 10 to 20 mm grit including the cost of materials labours and etc.to required for pro
Sector: Irrigation