Details: composite work of dredging of earth/sand work for minimum 90,000.00 m3 solid discharge in appx. 400 hr by deploying of 01 no. cutter suction dredger of minimum 250 m3/hour discharge (solid) capacity under project of dredging work for the expansion of circulating area from shastri bridge to sangam nose situated at right bank of the ganga river (near triveni sangam area) in district prayagraj.work will be carried as per direction of engineer-in-charge .during work contractors has to be ensure that environmental and social safeguards are strictly followed on site .contractor will ensure atleast 800 mtr discharge pipe line in which 400 mtr floting pipe line must be deployed at site so that dredge material can be disposed as per disposal plan.efficency of dredger machine is considered minimum 90%. (cost excluding of hsd oil for operation of dredger machine ). mobilization of above dredger with all its accessories and allied equipments to triveni sangam area in the ganga river district
Sector: Irrigation