Details: 9 meter wide roads on sector-6 earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level. 1:4:8 (1 cement : 4 coarse sand derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) centering and shuttering including strutting, propping etc. and removal of form forwalls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. centering and shuttering including strutting, propping etc. and removal of form for suspended floors, roofs, landings, balconies and access platform providing and laying in position ready mixed or site ba
Sector: Urban Authority