Details: excavation in foundations in ordinary soil (loam clay or sand) including lift up to 1.5 m. (5ft.) & lead upto 30m (100ft.) and including filling, watering & ramming of excavated earth into the trenches or into the space between the building & side of foundation trenches or into plinth and removal and disposal of surplus earth as directed by the engineer i/c upto distance of 30m. (100ft.) from foundation trenches (dsr 2.1 1/2023) providing and laying cement concrete 1:4:8 (1 cement: 4 coarse sand: 8 graded stone ballast 40 mm. nominal size) including supply of all materials. labour and t&p etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. (dsr 4.1.8/2023) brick work with common burnt clay f.p.s. (non modular) bricks of class designation 7.5 in foundation cement mortar 1:4 (1 cement: 4 coarse sand) (dsr 6.1.1/2023) construction of granular sub-base by providing coarse graded material, spreading in uniform layer
Sector: Urban Authority