Details: operation & maintenance operation and maintenance of the 11kv/ 0.433kv electrical substation 1&2 with allcomponents. operation and day-to-day maintenance of2 no. 500 kva and 2 no. 250 kva dg sets & 1 no. 320 kva dg sets. maintenance of the internal electricalinstallation of all the buildings on the campus. maintenance of the electrical fittings/ installation on all side roads, and compounds. preventive maintenance: the following schedule is for preventive maintenance of the substation consisting of 5 panel 11 kv ht board, 3 nos. 1000 kva transformers, bus ducting, lt panels, earth sets and cable terminations etc. while all specialized tools/ plants/ instruments required for the preventive maintenance are included, any material required for repair/ replacement of any items is not included, for which additional payment will be made after verifying the rate. the entire job will be done under the supervision of a qualified/ licensed engineer and work will be done as per the manufacturer’s
Sector: Management Education