Details: demolishing cement concrete manually/ by mechanical meansincluding disposal of material within 50 metres lead as per direction of engineer in charge.(15.2.1) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : 1:3:6 (1 cement : 3 coarse sand :6 graded stone aggregate 20 mm nominal size)(4.1.5) reinforced cement concrete work in beams, suspended floors, roofs having up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-iii) : 3 graded stone aggregate 20 mm nominal size). (5.3) steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. thermo-mechanically treated bars. (5.22.6) br
Sector: Science University