Details: construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. cartage 2000 m earth work in trench cutting in proper camber according to required depth for laying garnular sub base including rolling with road roller upto required m.d.d., dressing, cost of labour, t&p and hire charges of machinery etc. complete work as per construction of granular sub base by providing coarse graded material, mixing in a place method at o.m.c. carriage of mixed material to work site, spreading in uniform layer with motor grader on prepared surface and compacting with vibtatory power roller to achive the desired density complete as per clause 401. providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to si
Sector: PWD