Details: cleening of jungle at site earthwork in excavation in foundation in ordinary soil including 30m lead and 1.5 m lift with ramming dressing etc all completed as per direction of e/i. si no. 251 pcc work with cement approved c/sand and20mn gauge approved stone ballast ,in the propration 1:2:4 in bad plates excluding the supply of rain force cement and its bending supply of all other materials labour t&p etc. required for proper completion of the work. si no. 279 class -150 brick work in 1;4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and t&p etc. required for proper completion of the work. si no. 305b 25mm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand and 20mm grit.si no. 279 construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller
Sector: RDPR