Details: earth work in cutting or in embankment in ordernary soil exacavation to be the form or regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20 cm layers, including ramming & dressing the surface to required levels and slopes and also including lift up to 1.5m and lead up to 30 m. the earthe cutting to be used in making embankment or to be deposited as spoil banks within 30m (100ft.) distance and cartage upto 2 km distance as directed by the enginner-incharge. si no. 253+231(a) excavation in foundation in ordinary soil (loam clay, or sand) including filling lift upto 1. metre (5fts.) and lead upto 30m (100fts) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surlus earth as directed by the engineer - in - charge upto a distance of 30m. (100 fts.) from the foundation trenches.as per sch. pwd 251 providing and l
Sector: RDPR