Details: excavation in foundation in ordinary soil (loam clay, or sand) including filling lift upto 1. metre (5fts.) and lead upto 30m (100fts) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surlus earth as directed by the engineer - in - charge upto a distance of 30m. (100 fts.) from the foundation trenches.as per sch. pwd 251 providing and laying in cement concrete 1:6:12 (i cement : 6 fine sand : 12 graded brick ballast 40 mm. nominal size) including supply of all materials, labour and t & p etc required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. si no. sch. pwd 273 construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting wi
Sector: RDPR