Details: bed and berm/ scraping cutting filling upto 8cm of saryu pump canal from km. 6.500 to km.10.600 with all lead and lift including cost of all labour, material, t&p etc. and proper disposal of scraped material. but excluding cost of gst. cutting behaya/gondi grass and elephant grass on both bank of saryu pump canal between km. 6.500 to km. 6.650 and from km. 7.000 to 9.700 with proper disposal including cost of all labour, material, t&p etc. but excluding cost of gst.
Sector: Irrigation