Details: of granlar tob hare (058) by providing course graded maria layers with meter grader on prepared seface, ming by end with retacator at omc, and complaiting with smooth wheel roller to ved the deezenty complete as per clause 401. in the save with 24 bep biedinge men te voethutteong etc. and along a matema thetha m 150 chapter ntile steel of won in plan work such as reinforced concrete oneinforced brick work whommanicolen overall atest brought for proper completion of the work сповед на steel its wastage bend hooks and authorized ovet tapping theme two levet (0) 10mm to 12 tot 1853 first class drick work in 1:4 zement and coarse sand of 1.25 finesand modulous mortar in foundation and plinth including supply of all materials, labour, tools and plants ete, required for proper completion of the work mm thick coment plaster with cement mortar in proportion of 14 cement and fine and in single coat on fair side of single or half brick wall for interior plastering including arises, interior so
Sector: RDPR