Details: earth work in filling with ordanry soil including lead up to 30 mtr and lift up to 1.5 mtr, including extra cartage up to 8.00 km supply,laying and consolidation of 22.40-53 mm gauge stone ballast m-150 first class b/w in 1:4 cement c'sand mortor in sub structure including supply of all meterial labour t&p etc required for proper completion of work 12 mm thick plaster in 1:4 cement & fine sand mortor over brick work minimume thickness not less then 10 mm including all supply of meterial , labour t&p etc s.i.no. 584(i) supply and laying of rubber moulded c.c interlocking tiles 80mm thick in road pavement having a compressive strength not lass than 300 kg / cm2 including 40 mm thick bed of fine sand of f/m 1.25 providing and laying cement concrete with 1:2:4 (1cement 2 coarse sand and 4 graded stone ballast 20 mm nominal size) and curing complete, supply of all materials, curing, labour and t&p etc. required for proper completion of work as per direction of e/i) as per si. no.279(a) r
Sector: RDPR