Details: distt. of old rcc coverd slab/ ramp including stacking of all materialat site e/w in filling with ordinary soil cartage upto 6km i/c watering, dressing compaction all complete excavation in foundations in ordinary soil ( loam clay or sand ) including lift up to 1.5 m and lead up to 30.0 meter and including filling, watering and ramming of excavated earth in to the trenches or into the space between the building and the sides of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the engineer- in charges up to a distance of 30 m from the foundation trenches cement concrete with 2cm gauge brick ballast fine sand & cement proportion of 1 : 4 : 8 complete work as per s.i. 281 m-150 first class b/w in 1:4 cement c'sand mortor in sub structure including supply of all meterial labour t&p etc required for proper completion of work 12 mm thick plaster in 1:4 cement & coarse sand mortor over brick work minimume thickness not less then 10 mm includ
Sector: RDPR