Details: site visit & photograph raising of mainhole earth filling/malwa on road including waterring ramming, consolidationand dressing etc ,completete including lead upto 30 m and lift upto 1.5 m including cost of supplied earth. (ar) earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m..(dsr2.8.1). l.c 1:5:10 (1 cement : 5 coarse sand(zone-iii) derived from natural sourse : 10 graded stone aggregate 40mm nominal size derrived from natural source (dsr 4.1.10). brick work with common burnt clay f.p.s(non modular) bricks of class designation 7.5 in foundation and plinth in (1:4 cement and mortar )including all material labour t&p complete .(dsr 6.1.2). construction of granular sub base by providing well
Sector: Export promotion